House 4178
Developed throughout the academic year, the students used computational design and robotic fabrication to realize a unique two-story timber structure. Throughout the project, multiple prototypes were designed, fabricated, tested and refined, leading to a final project proposal. In order to fabricate the final proposal, a new robotic setup consisting of two large-scale ABB industrial robots on a linear track was developed and installed. In an automated process, the robot precisely pre-cut and assembled over 4000 different elements into large component pieces which together created the walls, floors and enclosure. The final prefabricated elements are composed of three-dimensional spatial trusses autonomously clad with wooden shingles. The structure was then installed by assembling the individual prefabricated elements on-site. The project featured teaching contributions from various groups within the NCCR Digital Fabrication including the Block Research Group (BRG), the Chair of Sustainable Construction, and the Digital Building Technologies.
Gramazio Kohler Research
Prof. Matthias Kohler, Prof. Fabio Gramazio
Teaching Team: Luka Piskorec
Collaborators: Philipp Eversmann (NCCR Digital Fabrication Head of Education)
© Digital Building Technologies | Gramazio Kohler Research | ETH Zurich